Details: excavation in foundation in ordinary soil (loam clay, or sand) including lift upto 1.5 metre and lead upto 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space bwtween the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge of 30 m from the foundation trenches. cement concrete with 4 cm gauge approved stone ballast approved coarse sand cement in the proportion of 8:4:1 including supply of all material t&p etc. required for proper completion of work. first class brick work in 1:4 cement and coarse sand mortar in foundation plinth including supply of all materials, labour and t&p etc. required for proper completion of work. 20mm cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, an
Sector: PWD