Details: e/w in cutting in ordinary soil excavation to be in the form of regular pits including ramming and dressing the surface to be required levels and slopes and also including all lead and lift. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distence as per directed by engineer -in -charge. e/w in filling in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20cm layers including ramming and dressing the surface to be required levels and slopes and also including all lead and lift. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 600 m distence as per directed by engineer -in -charge.
Sector: Irrigation