Details: transporation, , installation ,dimantling of rig machine and logging of bore hole. drilling of bore of 600mm dia (with pilot) bore , gl to 100 mbgl 600mm dia bore 101 to160 mbgl 600mm dia bore logging of bore hole by departmental/approved electric logger zone testing in water quality problem ares including all required material , labour, t&p etc complete in all respect ms tube well assembly with all required parts like plane pipe, slotted pipe(as required up to 50% of plane pipe), rings, wall cap, bail plug, clamp, reducer, central guide , support structure etc. as required @ as per typed design complete in all aspect-300 mm dia lowering of tube well assembly of 300 mm dia size with shrouding of pea gravel,gl to 100 mbgl(300mm dia) gl to 140 mbgl(300mm dia) transportaion, installtion, dismantling of 250/350/600psi compressor charges of development by 250 psi compressor per hour transportaton, dismantling , eraction of 1cuses/3cuses op united yield test charges of development by 3cus
Sector: RDPR