Details: clearing jungle including uprooting of rank vegetation, grass bush & wild trees measured at height of 1.0 meter above ground level located outside pheripheral area (30 mtr width) of 400 kv switchyard between pale fencing and s/s boundary wall area and removal of outside the periphery of upptcl area cleared with all cost of men, t&p, vehicle etc. clearing jungle including uprooting of rank vegetation, grass bush & wild trees measured at height of 1.0 meter above ground level located outside pheripheral area (20 mtr width) of 220 kv switchyard between pale fencing and s/s boundary wall area and removal of outside the periphery of upptcl area cleared with all cost of men, t&p, vehicle etc. uprooting of small wild trees in outside pheripheral area of 400 kv & 220 kv switchyards by digging and taking out the complete root, then disposal of all the removed vegetation, & garbage etc away from the sub station, premises and finally, levelling the ground with all cost of men, t&p, vehicle
Sector: Transmission