Details: dismantling of cement concrete including stacking of dismantled materials as directed by engineer-in-charge with in a distance of 60 meters . excavating trenches of required width of pipes etc including excavation for sockets and dressing of sides, ramming of bottoms, depth up to 1.50 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming and watering etc and disposing of surplus excavated soil as directed, with in a lead of 80 m. providing and fixing pvc pipe conforming ti is make working pressure 4 kg/sqcm including testing labour t&p and all complete fittings carting 100 mm dia sizes of pvc. pipes, pe-100, pn-6 pipes is:4984:1995 & its latest ammendments with couplers, specials & fittings etc. from store to site of works , lowering them into the trenches, laying true to alignment & gradient including cutting, threading making joints for making up lengt
Sector: RDPR