Details: supply and fixing of sign board including painting and lettering as directed by engineer-in-charge. clearing jungle including up rooting of trunk vegetation grass bush wood trees and sapling of girth upto 30cm. measured at a height of 1 meter above ground level and removal of upto a distance of 50m. outside the periphery of area cleared as per si.no. 2.31 boring holes of 200 mm dia piles of single under reamed of 500 mm f bulb and 3.50 m deep. providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as si no-5.1.2 earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by e
Sector: RDPR