Details: dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismatled materials as directed by the engineer-in- charge with in a distance of 60 meter (200 feet). s.i. no. 697. disposal of dismentling c.c. road material with cartage upto distance 5.00 km i/c loading and unloading including supply of all material,labour and t&p etc.required for proper completion of work. as per s.i. no. 231(a). disposal in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m. and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of surplus earth as derected by the engineer-in-charge upto a distance of 30m from the foundation trenches. (where machine can not reach/move). for building work only (excuding royalty) supply of the following sizes of hdpe pipes 6 kg/cm2 confirming to latest relevant i.s.s with hdpe couplers etc complete in
Sector: RDPR