Details: excavation of filling in foundation in ordinary soil including lift upto 1.5 mtr. and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the engineer incharge as per si. no. 251 cement concrete with 40mm gauge stone ballast fine sand of 1.25 fm and cement in proportion of 1:6:12 in foundation and under floors including supply of all materials ,labour , t&p, etc. required for proper completion of work as per si. no. 272 providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber applying and brooming stone screening to fill up the interstices of coarse aggregate,watering and compacting to the require
Sector: RDPR