Details: supplying and laying r.c.c. 1200mm dia np2 class in diversion during construction i/c cost of all material, labour, t&p etc complete. supplying, filling cement bags filled with local earth, hand sewing with sutly and placing in position within 60m i/c cost of all material, labour,t&p etc. complete. earth work in excavation in foundation trenches i/c dressing the sides and ramming of bottoms, for lifts i/c getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. cement concrete 1:3:6 (1cement : 3coarse sand : 6 graded stone aggregate 40mm nominal size) i/c cost of all material, labour, and t&p etc complete. reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) i/c cost of all material, labour, and t&p etc complete. cement concrete 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) i/c cost of all material, labour, and t&p etc complete
Sector: Irrigation