Details: laying and jointing pvc pipe. heading dismantling r.b. or r.c.c work including stacking of material within 60 meter lead. dismantling of brick masonry in cement i/c stacking within 60 m. earth work in filling in base of kharanja and for strenthening of banks i/c all lift & lead upto 1.0 km with mechanical compaction, ramming and dressing etc. complete. earth work in filling for strenthening of banks i/c all lift & lead upto 1.0 km with manual compaction, ramming and dressing etc. complete. earth work in excavation in foundation in dry soil i/c lift up to 1.5 m and lead upto 30 m and i/c back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30 m from the foundation trenches. laying brick ballast of size 25-40 mm i/c all cost materials, labour, t&p etc. laying c.c. 1:2:4 (m-15) using size (10-20) mm graded crushed aggregate i/c all cost materials, labour, t&p etc. laying
Sector: Irrigation