Details: demolishing reinforced cement concrete or reinforced brick work including stacking of materials as per directed by the of engineer - in -charge.sor 2022 s.i n0 694 dismantling sundries brick work including stacking of dismantled materials as directed by the engineer-in-charge within a distance of 60 metre (200 feet) sor 2022 s.i n0 692 deduct the cost of old bricks s.i n0 1(a) sor 2022 ded the cost of old bricks /batts s.i n0 1(f) sor 2022 cleaning of silt/sludge in foul condition lift upto 30 m distance etc all completed as per direction of engineer in charge . e/w in excavation in foundation in ordinary soil etc all complete as the direction of engineer in charge.pwd sor 2022 page no 15 si no 4.01 item no 251 (a).} disposal of earth up to 8.00 km from site including etc. all complete work. s.i n0-231(a) sor 2020 providing & supply gunny bags including cost of sand and stitching of bags and laying in position sor-2017 new item 20.21(b) dewatering/diversion of water by diesal engine
Sector: RDPR