Details: work earth work in cutting or in embankment in ordinary soil,excation to be in the form of regular pits not exceeding 0.5m in depth etc. asper s.i.no.-253. cartage 3 km excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. as per si no-251.schedule rate concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and t & p etc,required for proper completion of the work.as per si no-273 first class b/w in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and t&p etc required for proper completion of work. asper s.i.no.305(b) construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with s
Sector: RDPR