Description: BARRICADING WORK OF CRITICAL PARTS OF RAIL CORRIDOR UNDER PANKI RAILWAY SIDING OUTSIDE PANKI PROJECT PREMISES AT PTEP PANKI KANPUR Name of Work BARRICADING WORK OF CRITICAL PARTS OF RAIL CORRIDOR UNDER PANKI RAILWAY SIDING OUTSIDE PANKI PROJECT PREMISES AT PTEP PANKI KANPUR
Details: Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Clearing jungle including uprooting of rank vegetation, grass, bush wood, trees saplings of girth up to 20 cm. measured at a height of 1.0 M above ground level and removal of up to a distance of 50M. outside the periphery of area cleared (SOR2017-4.09) Structural steel work in single section, fixed with or without connecting pl
Sector: Generation