Details: excavating, supplying and filling of local earth by mechanical transport upto a lead upto 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. extra for earth work in embankment mechanically compacted to 95% proctor density in ordinary soil, excavation to be done in the form of regular pits not exceeding 0.5mtr in depth and embankment to be in 20cm layers including ramming and dressing pulverization of the surface including supply of abour, t&p, roller and water sprinkler. preparation and consolidating of sub grade with road roller 0f 8 to 1012 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade disposal of surplus
Sector: Industry Development