Details: earth work in exacavation in foundations in ordinary soil (loam clay or sand) including lift upto 1.5 m and lead upto 30 mt. & including filling, watering and ramming of excavated earth into the trenches or into the space between building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the e/i upto a distance of 30 mt. from the foundation trenches. filling of earth in plinth in 20cm layer including leveling, dressing and watering and also including of supply of earth including carted loading & unloading as per direction of engineer incharge.. sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone ballast 40 mm nominal size) and curing complete, including cost of form- work, in foundation. providing and injecting chemic
Sector: Infrastructure