Details: digging of proper size of pit for following work of damaged steel support with the provision of temporary support :- then reinforcement of steel support by welding of 04 nos. 2 feet long m.s. angle iron of 50x50x6 mm. at equal distance around each pole/ rail & also welding of these angle iron with each other by providing m.s. flat of size 35x6 mm. in round. after this construction of round plinth of pole will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). the plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. the rate will include all cost of material, labour and t&p etc. for completion of the above work which will be provided by the contractor at his own cost.
Sector: Distribution