Details: interlocking work earth work in filling in ordinary soil. granular sub-base with coarse graded material. p/ laying in cement concrete1:5:10( 1:cement, 5: courese sand, 10: graded stone ballast 40mm nominal size ) including all chargres t&p etc required for propar completion of work s.i no 4.1.10 m-150 brick work in 1:4 with cement & c/sand mortar.s.i.no.6.1 12mm thick cement plaster in 1:4 with cement & c/sand mortar.s.i.no.582(2) p/l of 80mm thick interlocking cement concrete rubber moulded paver blocks(tiles) floor . cement concrete in 1:2:4 with cement, c/sand & 20mm gauge stone grite. s/fixing of sign. board hall work excavation in foundation for structure as per dwaring in ordinarysoil (loam clay or sand) including lift up to 1.5 mtr. & lead upto 30 mtr. & including filling, watering and ramming of excavated earth into the trenches or in to space between the building and the sidding of foundation trenches or in to plinth and removale and di
Sector: Industries and Factories