Details: earth work in cutting or in embankment in ordinary soil excavation to be the form of regular pits not exceeding ½ meter (20”) in depth and earth work in enbankment to be in 20cm (8”) layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5”) lift and 30m (100’) lead. the earth form cutting to be used in making embankent or to be deposited as spoil banks within 30m (100’) distance as directed by the e/i.excluding cost of royalty si no -253 (a) + 3.00 km concrete with 4 cm gauge stone ballast, coarse sand and cement in proportion of 8 : 4 : 1 in foundation. incluing supply of all materials labour and t&p etc required for proper complition of work s.i n0 -281 r.c.c. work with cemct approvcd coarse sand and 2cn, gaug approved stone grit in proportion of 1:2.4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending bu including its fixing and binding the same with 24 b.w.g.g.i binding wire and includi
Sector: RDPR