Description: DESIGN SUPPLY INSTALLATION TESTING COMMISSIONING AND MAINTENANCE OF FLOATING PONTOONS AND GANGWAY WALKWAY AT PROPOSED LOCATION OF NW 3 Name of Work DESIGN SUPPLY INSTALLATION TESTING COMMISSIONING AND MAINTENANCE OF FLOATING PONTOONS AND GANGWAY WALKWAY AT PROPOSED LOCATION OF NW 3
Details: Design, supply, installation, testing, commissioning and Maintenance of Floating Pontoons and Gangway/ Walkway at proposed location of NW-3. General Upkeep and maintenance for smooth operation/utilization of complete offshore unit consisting of HDPE Pontoon & HDPE Gangway at the location for a period of 03 years.
Sector: Harbor