Details: cleaning of jungle including uprooting of vegetation grass etc inc. all as per s.i. 2.1 excavation in foundation in ord inary soil including lift upto 1.50 m and lead upto 30m. including watering ramming and dressing etc. and disposal of surplus earth as upto a distance of 30 m. from the foundation trenches.etc. required for proper completion of the work. si.no.251. l/sand filling into foundation and plinth i/c s/o sand labaur etc complete as per si no.255. cement concreat in foundation and base with 1:4:8 in cement, f-sand and 40mm gauge brick ballast i/c supply of the material labour t&p etc. as per si no. 275 m-150 b/w with 1:6 cement and f-sand morter in foundation i/c all labaur material t&p as si no 303, e/w in cutting and filling in ordinory soil i/c a cortage of 1 km distance including all complete of work.acs per si no.253 r.c.c.work in plinth band with cement, c-sand and 20mm dalla grit in proportion of 1:2:4 , excluding supply of reinforcement i/c all labaur material t&p
Sector: RDPR