Details: safe loading carriage including unloading and proper stacking of following materials from central store, lucknow to je store dump site. distance 0 to 30 km pcc pole 8.5 m long st pole 11 m long lt abc 3x95/120+1x95+1x16 sq. mm acsr rabbit/weasel condutor lt pvc cable 1x240 sq. mm transformer 100 kva transformer 250 kva transformer 400 kva line material safe loading carriage including unloading and proper stacking of following materials from je store site to site of work. distance 0 to 20 km pcc pole 8.5 m long st pole 11 m long lt abc 3x95/120+1x95+1x16 sq. mm acsr rabbit/weasel condutor lt pvc cable 1x240 sq. mm transformer 100 kva transformer 250 kva transformer 400 kva line material , grouting, plinthing, painting of substation type double pole with st pole 11 m long including mounting of top channel, dropper channel, base angle with clamps and nut and bolts. as per resspo norms and all material supplied by contractor. (only pole shall be supplied by deptt.) fabrication, ,
Sector: Distribution