Description: TOILET Name of Work
Details: Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upt 1.50 M, and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundaton trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M from the foundation trenches. (Where machine con not reach/move). For Building work only. (SI.-251). Cement Concrete with 4cm gauge B/B, F/Sand of 1.25 F:M cement proportion 8:4:1 i/csupply of all matrial Labour T&P etc./c in all camp. (S.I.No. 275) M-150 class Brick Work in 1:4 cement, C/sand mortar in foundation up to plinth as per (S.I. 305 R.C.C.work 1:2:4 with cement, approved Coarse Sand & 20cm guage stone grit etc. include in plinth & door bend centering & shuttering etc. copletion of work S.I. No.283 M-150 Brick Work in 1:4 with cement & coarse sand mortar in superstructure in one brick wall
Sector: RDPR