Details: concrete with 4 cm gauge stone ballast, coarse sand and cement in proportion of 8 : 4 : 1 in foundation. incluing supply of all materials labour and t&p etc required for proper complition of work s.i n0 -281 r.c.c. work with cemct approvcd coarse sand and 2cn, gaug approved stone grit in proportion of 1:2.4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending bu including its fixing and binding the same with 24 b.w.g.g.i binding wire and including necessary centering and shuttering etc. and supplh of all meterials, labour and t8p etc. required for proper completion o binding wire of supplied by the contractor free of cost. work. s no -283 mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all materials and labour t&p etc compl si no -504. cement concrete wit
Sector: RDPR