Details: cleaning of grass and removal of upto a distance of 30m outside the periphery of the area as per technical specification clause 201 pwd sor ch-5 sl no.-1 excavation in foundation in ordinary soil ( loam clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated soil into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth upto a distance of 30m. as per pwd sor ch-5 sl no.-1 concrete with 4cm gauge brick ballast , coarse sand and cement in proportion of 8:4:1 in foundation and under floor including supply of al mateials, labour and tools and plants etc required for proer completion for the work. as per pwd sor ch-6 sl no.-3[275] m-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants etc required for proper completion of work. as per pwd sor ch-7 sl 4[305 (b)] m-150 bri
Sector: Irrigation