Description: CONSTRUCTION OF ROOF TOP RAIN WATER HARVESTING BY BOARING CLUSTER 11 District Bhadohi Name of Work CONSTRUCTION OF ROOF TOP RAIN WATER HARVESTING BY BOARING CLUSTER 11 District Bhadohi
Details: Excavation in foundation in ordinary soil ( loam clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated soil into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth upto a distance of 30m. As per PWD SOR Ch-5 sl no.-1 Concrete with 4cm gauge brick ballast , coarse sand and cement in proportion of 8:4:1 in foundation and under floor including supply of al mateials, labour and tools and plants etc required for proer completion for the work. As per PWD SOR Ch-6 sl no.-3[275] M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants etc required for proper completion of work. As per PWD SOR Ch-7 sl 4[305 (b)] 12mm thick plaster with cement mortar consisting of 1 part cement and 3 part of approved coarse sand minimum thickness not be less than 10mm including supply of all
Sector: Irrigation