Details: e/w in filling with ordinary soil cartage up to 12 km etc complete . providing and laying cement concrete in 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including supply of all material, labour and t&p etc. required for proper completion of the work.all work upto plinth level providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - all work up to plinth level :(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of steel and its wastage bend,
Sector: RDPR