Description: NIRMAN WORK Name of Work 0 63 0 0 0 0 0
Details: Dismantling of B.O.E soling/ Inter locking tiles Including Stacking of serviceable material and disposal of unserviceable materials within a lead of 50m as per direction of EI/C (Labour only) Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Graded stone aggregate 40mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. Providing and laying in position specified grade of reinforced cement concrete, i
Sector: RDPR