Details: e/w in excavation in foundation with hard mixed soil ete all complete. s.i. no 251 concrete with 40 mm gauge brick ballast fine sand and cement in 10:5:1 etc. s.l.no 273 ist class brick work in 1:4 with cement and coarse sand ete all complete. s.i.no 305 (b) 12 mm thick plaster work in 1:3 with cement and fine sand etc all complete. s.i.no 584 suuply and fixin of stone patiya including etc all complete e/w in filiing of up to 8.00 km includin cartage including etc all complete. mix in place method construction of granular sub-base by providing closity, complete as per mord clause. s.i.no401 s/l of 8 cm thick c.c zig zag interlocking paver bricks joints filled with fine sand of 1.25 f.m mortar etc. all complete. s.i.no 508 for colourd interlocking cartage of materials by head load up to 3.00 (chainage) lead. s.i.no. 231 (a) cartage of bricks by head load up to 3.00 (chainage) lead. s.i.no. 231 (b) s/f of granite stone silapat with lettering etc all complete. add 18% gst
Sector: RDPR