Details: boq excavation in foundatoin in ordinary soil (lorm, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto distance of 30 m.from the foundation trenchess.(where machine con not reach / move). sor/item no.251(a)/4.1.1 cement concrete with 4 cm gauge approved stone ballast, coarse sand &cement in the proportion of 8:4:1 including supply of all materlals, labour, tools, & plants etc.required for proper completion of the work 8:4:1(1cement :4coarse sand: 8 graded stone aggregate 40mm nominal size)(sor/5.4.3/281) plain/reinforceed cement concrete in open foundation complete as per drawing and technical specifiations.rcc grade m25 using batching plant transit mixture and manual placing morth-20 item-19.06/e/case-ii steel reinforc
Sector: Industry Development