Details: providing 24x7 maintenance gang in 03 shift / day consisting of 1 supervisor + 3 technical staff + 4 non technical staff employee along with vehicle (with gps locational tool) fuel shall be provided by the contractor. scope of work defined below :-(i) line chart shall be prepared in autocad for all associated 33 kv, 11 kv and lt distribution network. soft and hard copy will be submitted to concerned division office.(ii) shutdown procedure :- shutdown shall be given by the junior engineer of concerned sub-station and junior engineer shall make sure to facilitate the same.(iii) locating & rectification of underground ht & lt line faults, which include road/trench digging, replacement of various damaged cables, making of cable joints (jointing kit shall be provided by deptt.), refilling of trench, repairing of roads shall be done by the contractor. arrangement of all associated t&p for attending faults shall be made by contractor itself.(iv) attending overhead line faults of 33 kv, 11 kv
Sector: Distribution