Details: boq excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m, and lead upto 30 m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge upto a distance of 30 m from the foundaiton trenches. (where machine can not reach/move). for building work only. (as per item sor no. 251a cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (as per item sor no. 281) cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. 279 same as above item no. 279 but with 2 c
Sector: Industry Development