Details: dismentling old mud phuskha in terracing and disposel of material within 50 m lead dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. dismantling roofing including ridges, hips, valley and gutters and including stacking the material within 50 m lead (asbestus cement sheet ) dismantling jack arch roofing and flooring including stacking of serviceable material and disposel of unservicebale matreial concrete with 4 cm gauge stone ballast coarse sand of 2.20 fm and cment in prportion of (1:4:8) in foundation and under floor 12 mm thick cement plaster (1:4) cement & coarse sand on fair side of wall i/c proper completion of work. trimixing of the surface of the cement concrete laid cement concrete flooring 1:2:4 ( 1cement : 2 coarse sand : 4 graded stone aggregate ) finished with a floating coatof neat cement , including cement slurry.
Sector: Sugar