Details: dismantling of b.o.e soling/ inter locking tiles including stacking of serviceable material and disposal of unserviceable materials within a lead of 50m as per direction of ei/c (labour only) earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5m in depth and earth work embankment to be in 20 cm layers including ramming and dressing the surface to required slows and also including 1.5m, lift and 30 m lead in all complete. site up to 12 km distance. providing and laying cement concrete in 1:6:12 (1 cement : 6 fine sand : 12 graded stone aggregate 40mm nominal size) including supply of all material, labour and t&p etc. required for proper completion of the work. in foundation and floors. providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - all work up to plinth level : (a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggr
Sector: RDPR