Details: boq excavation in foundation in ordinary soil (loam,clay or sand) including lift up to 1.5m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plith and removal and disposal of surplus earth as directed by the engineer in charge up to a distance of 30m from the foundation trenches (where machine can not reach/move) for building work only(sor-251a) depth from 0.0 to 1.5 m below g.l. cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plant etc.required for proper completion of the work (sor-281) reinforced cement concrete in open foundation complete as per drawing and technical specification. rcc grade m25 using batching plant transit mixer and manual placing morth-9.06e/case-ii steel reinforcement for rcc work including straightening, cutting, bendin
Sector: Industry Development