Details: part-a road workproviding and laying in position bitumen hot sealing compound for expansion joints etc. using grade-a sealing compound dsr-18/16.46.1) pcc grade m-25 using batching plant transit mixer & manual placing. (morth-20/15.11/d/p-655/case-ii part-b drain workexcavation in foundation ordinary soil (loam clay or sand) including lift upto 1.50 m and lead upto 30.00m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto distance of 30m from the foundation trenches (where machine con not reach/move) (sor/251 (a)/4.1.1) depth from 0.0 to 1.5 m below g.l. cement concrete with 4cm gaugeapproved stone ballast course sand & cement in the proporation of 8:4:1 including supply of all materials labour tools & plants etc required for proper completion of the work (sor-20/281/5.4.3) ceme
Sector: Industry Development