Details: excavation in foundations in ordinary soil (loamclay or sand) including lift upto 1.5 metre and lead upto 30m and including filling watering and ramiming of excavated earth into the space between the bulding and the side of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the engineer-in-charge upto a distance of 30m from the foundation trenches including all t&p phowarah and basket etc.complete. as per 6.1.no.251 providing and laying in cement concrete 1:4:8 (cement:4 find sand 8 graded brick ballast 40mm nominal size) and curing complete, including cost of formwork in foundation and floors. si no.-275 m-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. sl no.-305b providing 12 mm thick 13 plaster with cement and losarse sand mortar si no583 earth fork filling with 4.00 km cartage including all complete co
Sector: RDPR