Details: dismantl ing jack arches or wooden beam and berjas roofs including roof concrete & including stacking of dismantled materialss as directed by engineer-in-charge within a distance of 60 meters (200feet) but only roof concrete s.i.no. 696 earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge: all kinds of soil 2.1.1 excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. dsr 2.25 a providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggrega
Sector: PWD