Details: making bandh to stop water flow by earth firled bags and removel as it after cleaning the nallow all complete.work excavtion in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m,and lead upto 30 m and including filling, watering and ramming of exavated earth into the trenches or into space between the building and the sides, of foundation treches or upto the plinth and removal and disposal of surplus earth as ducctal by the eggineer- in - charge upto a distance of 30 m from the foundation trenches ( where machine can not reach/ more ) for buinlding work only s.i. 251 but excluding g.s.t disposal of malva upto 3.0 km lead loading & unload etc.all complete. but excluding g.s.t arragement of diesel pump set with labour t&p. concrete with 4cm.guage brick ballast fine sand of 1.25 f.m and cement in proportion of 1:6:12 in foundation and under floors including supply of all meterials, labour and t&p etc. required for proper complection of work .s.i.no 273. but exc
Sector: RDPR