Description: CONSTRUCTION OF RWH AT SAHKARI SAMITI MUKARI FIRST AND SECOND SANJAY GANDHI JUNIOR HIGH SCHOOL KAHARKA GRAM PANCHAYAT SACHIVALAY KAHARKA RAJKIYA PASHU KENDRA MUKARI AND GRAM PANCHAYAT SACHIVALAYA GHATOLI BLOCK PILANA DISTT BAGPAT Name of Work Construction of Roof Top Rain Water Harvesting at Sehkari Samiti Mukari Second and First Sanjay Gandhi Junior High School Kaharka Gram Panchayat Sachivalaya Kaharka Rajkiya Pashu Kendra Mukari and Gram Panchayat Sachivalaya Ghatoli Total 6 sites Block Pilana District Baghpat
Details: Transportation of boring material & boring set including loading & unloding at site Water tanker charges (p.w.d. s.o.r ch-2/item no 12 ) 150 mm dia boring drilling with casing pipe or small drilling machine SE MI meerut Preparation of lowering of 110 mm 6 kgf PVC pipe assembly 110 mm 6 kgf/cm2 PVC plain pipe kishan/ supereme quality or equivalent 110 mm 6 kgf/cm2 PVC perforted pipe kishan/ supereme quality or equivalent 110 mm 6 kgf PVC coupler/socket 110 mm PVC end cap Solvent cement Nylon mesh Nylon dori 5 mm. Development of Boring 110 mm pipe for air vent 2-4 mm pea gravel Earth work in excavation in trenches for foundation pipes cables etc. in ordinary soil (Loam ,clay or sand)including lift up to 1.5m & lead up to 30 m and dressing of sides and rammings of bottom and disposal of surplus excavated earth as directed by Engineer including within a lead of 30m Providing and laying of PCC 1:4:8 in cement, fine sand & 25 to 50 mm BRICK ballast including labour & T&P etc. Fi
Sector: Irrigation