Details: excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all t&p. sl no.- 251 providing and laying in cement concrete 1:4:8 (1cement:4 find sand :8 graded brick ballast 40mm nominal size) and curing complete, including cost of formwork in foundation and floors. sl no.- 275 m-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. sl no.- 305b providing and laying pcc 1:2:4 including all complete providing and laying plaster in 1:4 including all complete earth work filling with 4.00 km cartage including all complete. construction of granular sub base by
Sector: RDPR