Details: excavation in foundation in ordinary soil (loam, clay or ) including lift upto 1.50 upto30m.andincludingfilling ingof excavatedearth into the trenches or into the space between the building and the sides of ion trenchesor into theplinthand removal anddisposal of thas directedby eer-in-chargeuptoa distance of 30 m. the foundation enches. (where machine can not reach/move). mixed with oorum, shingle, kankar requiring the use of special tools and plant such as pickaxes, sabbals etc. cement concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 12:6:1 including supply of all materials, labour, tools & plants etc. required for proper ompletion of the work. first class brick work in 1:4 cement & coar sand 1.25 m. mortar in foundation and plinth including supply of all materials, labour and t&p etc. requried for proper completion of the work. 12 mm thick plaster with cement and coar sand of 2.20 fineness les in 1:4 over brick work minimum thick
Sector: RDPR