Description: Construction of RWH at Sanviliyan School Udhankheda Bharatpurwa and Tilsahari Bujurg Block Sarsaul Name of Work Construction of RWH at Savilliyan School Udhankheda Bharatpurwa And Tilshari Bujurg Sarsaul
Details: Digging of pit for water collecting (Pit size = 3.0mX3.0mX1.50m = 13.50 m3) as per ID SOR CH- 5 SN-5 Boring/drilling bore well of required dia for casing/strainer pipe, by suitable method prescribed in IS: 2800 (Part I), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, up to 90 metre depth below ground level. (CH-28 S.N.1) Tractor with water Tanker 6 KL Capacity including driver & POL (8 Hour). as per PWD (CH-2 S.I. 45) Development of Tubewell in accoudance with IS: 2800 (Part 1) and IS: 11189, to establish maximum rate of usable water yield. charge by compressor. as per PWD (CH-28 S.I. 12) 150 mm dia Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required
Sector: Irrigation