Details: excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100m. including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per 302 (ii) cartage upto 1 km earthwork in excavation for structures as per drawing and technical specifictions clause 305.1 including setting out. construction of shoring and bracing. removal of stumps and other deleterious material and disposal upto a lead of 50 m. dressing of sides and bottom and backfilling in trenches with excavated suitable materials as per mord 11.1 - 300 concrete with 40mm gauge brick ballast/ store ballast f/sand & cement in proportion of 12:6:1 in foundation and under floor including supply of all materials labour and t&p etc required for proper completion of the work as per sor pwd brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifica
Sector: RDPR