Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per mort&h specification no. 201 clause 2.3to provide smooth and firm level for safety purpose painting 'h' & 'l' at helipad filling of cartage earth (3 km. distance) both side of shoulder of the road including loading, unloading, ramming, dressing and leveling etc complete as per direction of eng-in-charge. sand filling in foundation trenches abutment wall etc,in layers including watering ,compacting including all lead & lift and also all materials ,labour,t&p etc. required for proper completion of work (si-255) jcb for making of side road and levelling of ground and vehicle parking ground brick soling with st
Sector: PWD