Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete .as per reference to mort&h specification 401 sn. 4.01 rates are including all labour, material, t&p, taxes & labour cess but excluding gst providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to
Sector: PWD