Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of atoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m all kind of soil.ar/yea/808/sno.-6/p-7 cement concrete with 4cm gauge approved stone ballest, coarse sand cement in the propertion of 8:4:1 including supply of all material, labour, tools & plants etc. required for proper completion of the work uppwd/sor/281/p-17 centering and shuttering including strutting, propping etc. and removal of form for: foundations, footings, bases of columns, etc. for mass concrete.ar/yea/808/p-3 centering and shuttering including strutting, propping etc. and removal of form for: lintels,beams,plinth beams,girders, bressumer sand cantilevers. centering and shuttering including strutting, propping etc. and removal of form fo
Sector: Industry Development