Details: earth filling work: construction of embankment with material obtained from burrowpit. construction of embankment with approved material obtained form burrowpits with all lift and heads transporting to site 12.00km spreading grading to required and compacting to proper requirment of table 300-2 of morth in ramgarhtal at jetty area (analysis rate) boring, providing and installation bored cast-in-situ reinforced cementconcrete piles of grade m-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using direct mud circulation (dmc) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and
Sector: Urban Authority