Details: construction of subgrade with material obtained from borrow pits for local earth construction of embankment with approved material obtained from abailable land and permitted and approved by engineer in charge and as per technical specification clause 301.3.4.1 with all lift and leads,spreading,gradding to required and copacting to meet requirment of tables 300 land,300.2 as per tech classification 301.5. including lead up to 2000 meter 15km excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundatio concrete with 40mn gauge b/b, fine sand of 1.25 fm and cement in proportion of 12:6:1 including supply of all materials, labour and t&p etc. required for proper completion of the work. si.n0.273 m-150 brick work in 1:4 cement & fine sand (1.25 f.m.) mortar morter in foundation and plinth includ
Sector: RDPR