Details: labour chargese for site clearence i excavatiopn in foundation in mixed soil (loam clay sand) includdding filling lift up to 1.5 m and lead up to 30 m & including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side offoundation trenches or plinth and removal and disposal of surplus earthsor 252 cartege skm 128+183 construction of granular sub-base by providing well graded ready mixed sukrut material, spreading in uniform layers with motor grader on prepared surface with at omc, and compacting in two layer with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. providing, laying, spreading and compacting stone aggregates of 22.4-53mm sukrut stone ballast size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming, type-b scre
Sector: Urban Authority