Details: earth work in filling with cartage distance 8 km from work site i/c all comp of work supplying & stacking of 22.4 to 53 mm size ram nagar stone ballast with screening material with load unloading. consolidation of stone ballast with out road roller charges i/c opening out stacks sorting in to proper size carraige of mattel up to proper size carraige of mattel up to 30 mm supply and maintenance of barriers caution post light at hight carraige of water up to 200 m i/c water all labour and t&p etc. providing & laying tack with bituman emulsion@0.20kg/sqm & including of all comp of work supplying & laying 50mm thick b m layer using crushed aggrigate of garding premixed with 60/70grade imulsion@3.5% of total mix i/c all comp of work supplying & laying 25mm thick sdbc using crushed agg(10mm nominal size premixed with crbm 55@5% of mix & all comp of work
Sector: RDPR